Valve proving controls TC 1-3

Valve proving controls TC 1-3 for checking two safety valves before or after burner run.

Valve proving controls TC 1-3 for checking two safety valves before or after burner run. The valve proving controls are equipped with an adjustable test period. Further the valve proving controls are used for adjustment to different test volumes.

Product Websites

Global Websites

Elster Kromschroeder Docuthek

You can find all Kromschroeder documents here.

 www.docuthek.com

Elster Kromschroeder courses

Our specialist courses are intended for operators of process heat systems, service personnel as well as planners and field workers.

more

 

BK G4 3D Animation

Start the animation

 

 

 

 

 

Virtual walkaround ISH 2009

Elster GmbH

P.O. BOX 2809

D-49018 Osnabrück

Strotheweg 1

D-49504 Lotte (Büren)

Germany

 +49 541 1214-0

 +49 541 1214-370

info(at)kromschroeder.com

 

TC 1, TC 2
TC 3

Valve proving controls TC 1-3

Valve proving controls for checking two safety valves before or after burner run, with adjustable test period (10 to 60 s) for adjustment to different test volumes, leakage rates and inlet pressures, FM approved, TC 1 and TC 2 UL listed.

TC 1 for MODULINE valves,

TC 2 for quick opening single valves,

TC 3 for manual resettable valves or slow opening valves, testing before or after burner run, switchable,

pe: max. 200 "WC (500 mbar),

mains voltage: 24 V DC,

110/120 V AC or 220/240 V AC.

 

 

Docuthek > TC 1-3